IBS Engineer

Mar-2015 ~ Apr-2017

Main responsible

  • Project proposal
  • IBS system design (2G, 3G and LTE)
  • Project schedule
  • Subcontractor manage
  • Equipment delivery
  • Implementation and UAT delivery

Tools used

  • IBWAVE
  • Tems Investigation
  • Actix Analyzer
  • Site Analyzer (VSWR and Power)
  • OTDR

Project case

  • AEON MALL Phnom Penh (AEON1) (DAS System) (CamGSM)
  • Raffles Hotel Le Royal (Repeater) (CamGSM)
  • Crown Bavet Casino Hotel (Repeater) (CamGSM)
  • Courtyard by Marriott Phnom Penh (DAS system designed) (CamGSM)
  • The Bridge (Small Cell system designed with IPTV, CCTV, Public WiFi)
  • AEON MALL SENSOK(AEON2)(DAS + Small Cell system designed) (Seatel)
  • Vattanac Capital (Redesign the existing DAS for expansion) (Owner)